Raw land, no well, no septic. Electric poles nearby. Approximately 48 trees have been cleared. A 20 foot drain pipe has been installed at the beginning of the driveway for a construction entrance. The area has been cleared for a house, septic and driveway. A perc test and deep hole test has been done. Engineering plans have already been done for a home and septic but not for a well. Basically all the leg work has been done. Engineered site plan, survey and proposal for home in hand according to residential building code for the municipality. Owner discloses interest.